Section 2 of the deliverable describes the overall infrastructure setup process at the use case partner side. It also describes the setup of the isolated computing system for the DAI-DSS tool to avoid risks to the corporate network.
Section 3 then details the technical preparation tasks such as data collection, human expert training, user selection and implantation of the current DAI-DSS prototype as a use case site and integration with the legacy systems.
Section 4 describes the overall testing procedure. This includes a brief description of the user evaluation and the corresponding KPIs for testing the use cases in general. In summary, this deliverable provides a brief update on the deployment of the first iteration of the FAIRWork DAI DSS. The first iteration has clearly shown that the DAI-DSS is a useful tool for future decision making in Flex and CRF.
@techreport{fairwork_d5.2,
title = {DAI-DSS Infrastucture and Setup Report at Use Case Site - D5.2},
author = {Aleassandro Cisi, Roland Sitar},
editor = {Roland Sitar},
url = {https://fairwork-project.eu/deliverables/D5.2_DAI-DSS_InfrastructureAndSetupReportAtUseCaseSite_v1.0_preliminary.pdf},
year = {2024},
date = {2024-04-30},
abstract = {The purpose of the document, "D5.2 – DAI-DSS INFRASTRUCTURE AND SETUP REPORT AT USE CASE SITE" is to provide an update on the progression and current state of implementation on use case sites of the Democratic AI-based Decision Support System (DAI-DSS) Architecture as part of the FAIRWork project.
Section 2 of the deliverable describes the overall infrastructure setup process at the use case partner side. It also describes the setup of the isolated computing system for the DAI-DSS tool to avoid risks to the corporate network.
Section 3 then details the technical preparation tasks such as data collection, human expert training, user selection and implantation of the current DAI-DSS prototype as a use case site and integration with the legacy systems.
Section 4 describes the overall testing procedure. This includes a brief description of the user evaluation and the corresponding KPIs for testing the use cases in general. In summary, this deliverable provides a brief update on the deployment of the first iteration of the FAIRWork DAI DSS. The first iteration has clearly shown that the DAI-DSS is a useful tool for future decision making in Flex and CRF.},
howpublished = {https://fairwork-project.eu/deliverables/D5.2_DAI-DSS_InfrastructureAndSetupReportAtUseCaseSite_v1.0_preliminary.pdf},
keywords = {deliverable},
pubstate = {published},
tppubtype = {techreport}
}